Skip to content
  • Home
  • About
  • Services
    • Pipeline Construction
    • Pipeline Replacement
    • Pipeline Maintenance and Repairs
    • Cofferdam Construction
    • Valve and Fittings Procurement and Replacement
    • Manifold and Facility Upgrades (Mechanical Modifications)
    • Habitat Installation
    • Destructive & Non-Destructive Tests
    • Pigging Services
    • Corrosion Condition Monitoring, Corrosion Control & Cathodic Protection
    • Procurement Services
    • Instrumentation and Controls
    • Provision of Manpower
  • Projects
  • Careers
  • Contact
  • Home
  • About
  • Services
    • Pipeline Construction
    • Pipeline Replacement
    • Pipeline Maintenance and Repairs
    • Cofferdam Construction
    • Valve and Fittings Procurement and Replacement
    • Manifold and Facility Upgrades (Mechanical Modifications)
    • Habitat Installation
    • Destructive & Non-Destructive Tests
    • Pigging Services
    • Corrosion Condition Monitoring, Corrosion Control & Cathodic Protection
    • Procurement Services
    • Instrumentation and Controls
    • Provision of Manpower
  • Projects
  • Careers
  • Contact

Our Projects

Inservice Welding Repair by Split Tee Installation

JIV / IC Removal & Leak Repair by Clamping

Post IP Defect Repair by Sectional Replacement on 24” TNP Using Cofferdam Construction

Restriction Removal from the 24″TRP By Sectional Replacement

Leak Repair by Clamp Welding on the 20” K2S

Post IP Defect Repair by Sectional Replacement on the 24” TRP

Flushing, Drying & Nitrogen Purging of the: 2″/4″ X 6.5km Well 70 Gas Lift Line, 2″ X 4.7km Well 54 Gas Lift Line from Agbada 2 FOC

Egbema Valve Change-Out

Upgrade of Escravos Manifold

Removal Of 2” Leaking Pig Signaler and Installation Of 2” Valve

Post IP Defect Repair by Sectional Replacement On 24” TNP

28” & 24” Barrel Door Replacement using Habitat

Flange Management

Inservice Welding Repair by Split Tee Installation

Non-Leaking ICs Repair by Split Tee

JIV Repair by clamping on 18” Assa Rumuekpe TL

JIV Repair by clamping on 18” Assa Rumuekpe TL

Post IP Defect Repair by Sectional Replacement on the 24” TNP

Post IP Defect, Dents, Clamp Identifications, and Repair by Sectional Replacement on the 10” Diobu Creek

IC Removal- Repair by Clamping on 14” Okordia Rumuekpe TL

Say Hello

  • #12 High Street, Trans-Amadi Industrial Layout, Port Harcourt.​
  • info@adragang.com

Menu

  • Home
  • Projects
  • Careers
  • Services
  • About
  • Contact Us

Socials

  • LinkedIn
  • Instagram
  • Twitter
  • Threads
  • YouTube
  • Adraga © 2022. All Rights Reserved.