Removal Of 2” Leaking Pig Signaler and Installation Of 2” Valve

Following the plan to change some leaking Pig Signaller on the 28” TNP line @Bomu Manifold. SPDC Pipeline required replacement of 2” Pig signaler. The site activities followed these steps;

  • Venting of the line
  • Cold-cutting of the line
  • Fit-up & weld
  • NDT (Radiography & UT)
  • Installation of valves and blinding
  • Torquing of the bolts
  • Touch up painting was carried out