Following the successful completion of the pipe surface welding for the replacement of the defect sections on the 24” TNP at Kpite, the replacement spool of 200m was tied to the existing pipeline.
Following the successful completion of the pipe surface welding for the replacement of the defect sections on the 24” TNP at Kpite, the replacement spool of 200m was tied to the existing pipeline.