Pipeline Repair by split-Tee installation was carried out on the 20” TEP @ Otumara. The goal was to restore the line to safe working condition and prevent further third-party interference. The revised strategy involved the installation of a split tee over the illegal connection. The repair work was carried out successfully with due consideration to safety and environment by our project team.