Flushing, Drying & Nitrogen Purging of the: 2″/4″ X 6.5km Well 70 Gas Lift Line, 2″ X 4.7km Well 54 Gas Lift Line from Agbada 2 FOC

Following the request to carry out Flushing, Drying and Nitrogen Purging on different Gas Lift Lines of HHOG, Our project team carried out out Flushing, Drying and Nitrogen Purging on the 2”/4” x 6.5 Km & 2″ x 4.7 Km Gas Lift Lines from Agbada 2 FOC to Wells 70 & 54.The project intention was to free-up the Gas Lift lines and the activities done could be said to have achieved the purpose of the project as the pressure on the 2”/4” x 6.5 Km Well 70 & 2″ x 4.7 Km Well 54 Gas Lift lines have been balanced, showing no leakages and the pressure readings from the Well 70 2”/4” x 6.5 Km Gas Lift Line was between 64-65 bars as against 53 bars at the start of the project, While pressure readings from the 2″ x 4.7 Km Well 54 Gas Lift Line was building up gradually after it was commissioned.

Project Gallery