JIV / IC Removal & Leak Repair by Clamping

The pipeline evacuates hydrocarbon oil from Oguta Manifold to Egbema Manifold. Pipeline Repair by clamping method was carried out on the pipeline at Eziorsu. The goal was to restore the line to optimal production and prevent further environmental impact. The scope was to expose the leak, carry out JIV and repair the line by clamping. One 12”x 10” Egba Clamp was installed with the aid of a Pneumatic Torque machine. The leak was caused by illegal activities along the ROW.