IC Removal- Repair by Clamping on 14” Okordia Rumuekpe TL

Illegal Connections were reported on the 14” Okordia – Rumuekpe TL@ Ikata. Pipeline repair by clamp installation were carried out on the pipeline.

Project Gallery