Post IP Defect, Dents, Clamp Identifications, and Repair by Sectional Replacement on the 10” Diobu Creek

Following the asset integrity report of defect sections along the pipeline, our project team carried our Survey measurements, ROW Leak inspection, excavation to expose the pipeline and identified the defect points, after which repair was carried out by sectional replacement.