Following the Illegal Connections Removal Campaign on the 18” Assa – Rumuekpe TL, JIV/Nonleaking IC removal and line repairs were carried out by clamp installation carried out on the 18” trunk line.
Following the Illegal Connections Removal Campaign on the 18” Assa – Rumuekpe TL, JIV/Nonleaking IC removal and line repairs were carried out by clamp installation carried out on the 18” trunk line.