JIV was done at the locations to confirm if existing ICs were non-leaking or leaking.
Repair by Split Tee Installation was done at 2 locations – Akpajo and Elelenwo. A total number of 3 Split Tee (28” x 28) installations were carried out.
The project intention was to stop third parties from accessing products from the 28” TNP pipeline @ Aleto & Akpajo.